Cupertino Comfort and Style | Freemodel

Cupertino Comfort and Style

SOLD
$3,000,000
RENOVATION
$237,205
LOCATION
Cupertino, CA

This 3 bedroom, 2 bathroom mid-century home in Cupertino sits on a peaceful cul-de-sac and features striking double-height ceilings, original hardwood floors, and a deck overlooking a pool and landscaped backyard. Agent Kelly Kang of Golden Gate Sotheby's International Realty paired up with project director Adam Soares to modernize this space and add new design finishes before this property hit the market. Some of the major upgrades on this project included installing new hardwood flooring, new countertops and backsplashes in the kitchen, functional and design upgrades in both bathrooms, and fresh paint and deck work on the exterior of the home. Once this project wrapped up, the home sold for $3,000,000!

Freemodel’s scope of work for this project included:

- All rooms: installed new flooring, repaired damaged framing, installed new drywall, installed new baseboards and trim, installed new 6" led can lights, installed new switches receptacles, removed popcorn ceilings and repaired and patched all interior walls, interior and exterior staging

- Kitchen: Ran new power source for appliances, lights, fixtures, plugs and switches, installed under-mount sink & faucet, installed disposal and air switch, installed countertops, installed backsplash, installed range, extractor fan, microwave, dishwasher and refrigerator (including water hook-up)

- Guest Bath: Ran new power source for appliances, lights, fixture, plugs and switches, glazed bathtub, installed prefab niche, installed sliding door for the tub, installed fixed shower head, tub filler, temp valve and volume valve, installed tile floor, tile walls in tub and tile niche, installed extraction fan, installed toilet, installed new vanity counter and sinks, installed sink faucet, installed vanity mirror, installed towel bar, towel ring, robe hook & toilet paper holder

- Main bath: Glazed bathtub, installed prefab niche, installed sliding door for the tub, installed fixed shower head, tub filler, temp valve and volume valve, installed tile floor, tile walls in tub and tile niche, installed extraction fan, installed toilet, installed new vanity counter and sinks, installed sink faucet, installed vanity mirror, installed towel bar, towel ring, robe hook & toilet paper holder

- Exterior: repaired and completed exterior paint, built new deck with redwood to match existing design, repaired backyard fence, removed damaged wood on the fence dividing properties on the right side facing and installed new fencing to match the existing fence, completed staging for exterior patio area

  • Before

  • After

Ready to find out how much more your listing can sell for?