Fresh Upgrades in Fullerton
$56,026 Profit
SOLD
$815,000
AS-IS
$550,000
RENOVATION
$208,974
LOCATION
Fullerton, CA
This 4 bedroom, 2 bathroom single story home in Fullerton is situated on a private cul-de-sac and features a spacious living room and beautiful natural light. Agent Scott Gold of BHHS California Properties teamed up with project director Dee Wise and Freemodel Design Team to redesign this property before it was made available to local buyers. Under Dee’s direction, some of the major improvements included the installation of new luxury vinyl flooring throughout the home, new cabinets and countertops in the kitchen, new vanities and amenities in both bathrooms, and fresh exterior landscaping. Once this project wrapped up, the property sold for $815,000, netting the sellers a $56,026 profit!
Freemodel’s scope of work for this project included:
- All rooms: Luxury vinyl flooring installed, popcorn ceiling removed, all walls, ceilings, trim, doors, and closets patched and painted, new door hinges and casings installed, sliding windows replaced, new furnace and AC unit installed
- Entry: new craftsman glass double front doors installed, new handle and deadbolt added, new recessed dimmable can lights added
- Kitchen: new recessed dimmable can lights added, new cabinets and hardware installed, new under-mount sink and faucet added, new disposal and air switch added, new countertops and backsplash installed, new range, microwave, and dishwasher installed, new refrigerator with water hook-up installed
- Bedrooms: ceiling fans replaced with light and fan combination fixtures,
- Master bathroom: replaced vanity light, replaced ceiling vent with fan and light combination, frame curbed shower pan added, prefab niche installed, frameless hinged shower door installed, medium format tile flooring and shower pan installed, large format tile walls added in the shower, tile niche installed, new extractor fan and toilet installed, new prefab vanity cabinet, countertop, sink, faucet, mirror, and hardware installed
- Hall bathroom: drywall around shower repaired, new bathtub and toilet installed, new prefab niche and sliding door for tub installed, new fixed shower head, tub filler, temperature valve, and volume valve added, large format tile floor and tile walls installed, extractor fan added, new prefab vanity cabinet, countertop, sink, faucet, mirror and hardware installed, new wood baseboards installed
- Garage: new water heater installed, new utility sink installed, new garage door lift mechanism installed
- Exterior: power washed, stucco patched, walls and trim painted, entry lights added at the front door, garage, and rear patio, grass and weeds removed, overgrown shrubs and trees trimmed, drought-friendly plants added to front landscaping, drip system added, mailbox replaced
Before
After