Happy Returns in Hercules
$114,925 Profit
104% Return
SOLD
$950,000
AS-IS
$725,000
RENOVATION
$110,075
LOCATION
Hercules, CA
This 4 bedroom, 3 bathroom home in Hercules features cathedral ceilings, an eat-in kitchen, and a beautiful backyard with a pool. Agent Holly Bradford of Red Oak Realty teamed up with project director Dominique Lawrenz to add some modern conveniences and new design features to this property before it was made available to buyers. Under Dominique’s instruction, some of the major upgrades included the installation of new luxury vinyl flooring, new appliances in the kitchen, vanity upgrades in all the bathrooms, and new exterior detailing. Once this project wrapped up, the home sold for $950,000, netting the sellers a $114,925 profit and a 104% return on their investment!
Freemodel’s scope of work for this project included:
- All Rooms: demolished flooring, installed LVP, installed new baseboards, painted walls, ceilings, on first and second level, fireplace & trim, removed all shelves and window treatments in bedrooms, living room, dining room, family room and kitchen, painted hand railing on stairs, painted trim, baseboards, and doors, applied one coat of primer on the ceilings, replaced existing outlets, switches with standard white, installed new disposal, replaced flush mount ceiling lights, installed new indoor door handles, installed 2 new front door and deadbolt handles, patched the ceiling after popcorn removal (except the kitchen), Mud coated ceilings where popcorn was removed
- Kitchen: painted kitchen cabinets, installed new GFCI outlets, installed new hood, installed new sink faucet, installed subtop and countertop, removed microwave box & cabinets around hood vent, installed undermount sink & faucet, installed new cabinet pulls, installed gas stove and range
- All Bathrooms: painted vanities, removed built in medicine cabinets, added drywall, patched prepared for painting, installed new GFCI outlets, replaced vanity lights
- Primary Bath: prepared and recaulked shower and epoxy shower floor and tile, installed sink faucet, installed double sink counter, installed fixed shower head, temp valve and volume valve and drain, installed 2 vanity mirrors, installed towel bar, towel ring, robe hook & toilet paper holder, installed new cabinet pulls
- Upstairs Guest Bathroom: prepared and recaulked shower and epoxy shower floor and tile, installed sink counter, installed fixed shower head, temp valve and volume valve and drain, installed sink faucet, installed vanity mirror, installed towel bar, towel ring, robe hook & toilet paper holder, installed new cabinet pulls
- Downstairs Bathroom: installed sink counter, installed fixed shower head, temp valve and volume valve and drain, installed sink faucet, installed vanity mirror, installed towel bar, towel ring, robe hook & toilet paper holder, installed new cabinet pulls
- Guest Bathrooms: removed and installed 2 layers of subfloor in the 2 guest bathrooms
- Exterior: touched up paint on exterior door to garage frame, painted new plywood added to pool pump house, painted exterior landing, replaced wall mount light, repaired front irrigation system, installed new house numbers, sealed and repaired window and stucco leaks