Hitting the Heights
$123,439 Profit
SOLD
$1,600,000
AS-IS
$1,000,000
RENOVATION
$476,561
LOCATION
San Francisco, CA
Carefully crafted by Fremodel’s Project Director Azary Khalfan, Director of Operations Lauren Sharp, and Vantage Realty’s Clay Gjevre, this extensively renovated home offers a completely transformed living experience, starting with lowered floors, flowing seamlessly into every room with new luxury vinyl flooring, fresh paint, and modern ceiling light fixtures; significant structural enhancements include opened walls for an airy feel, removal of closets, and a redesigned downstairs bathroom featuring relocated plumbing and electrical, a new bathtub, tiled shower, vanity, and modern fixtures; the kitchen is a chef's dream with new cabinets, quartz countertops, backsplash, and a full suite of stainless steel appliances; upstairs, the hallway boasts a new light fixture, while the exterior has been meticulously updated with power washing, fresh paint, new gutters, skylight glass, repaired pipes, and a fully landscaped yard with irrigation; critical upgrades include a new exterior electrical meter, upgraded wiring, and a garage equipped with a new door opener and a 50-amp EV charger, ensuring both modern convenience and structural integrity.
Freemodel’s scope of work for this project included:
- All Rooms: Lowered floor to achieve approved ceiling height, installed Luxury vinyl flooring, patched & painted walls, ceiling & trim, installed ceiling light fixtures, replaced switch/outlet covers, removed two closets, opened wall facing new stairs, removed doorway, opened wall facing dining area,
- Exterior: Powerwashed, patched and painted walls, doors, and trim, replaced gutters, replaced skylight glass, repaired pipes correctly, replaced drain lines, covered exposed ceiling with drywall, replaced leak and replace drywall, fixed dryer vent, added insulations and covers, replaced rot damage, tar coated, replaced house numbers, removed all bushes and weed, trimmed trees, added new plants and flowers, added mulch, added irrigation for new plants on timer, installed a new exterior electrical meter per PG&E request, upgraded all existing wires and connect to new meter, installed an electrical service pipe
- Upstairs hallway: Replaced light fixture
- Kitchen: Installed cabinets & hardware, installed undermount sink & faucet, installed disposal and switch, installed Quartz countertops, installed backsplash, installed range, installed microwave, installed refrigerator, installed dishwasher
- Downstairs Bathroom: Repaired rot damage under bathroom, relocated plumbing & electrical per new design, repair drywall, installed bathtub, installed prefab niche, installed sliding door for tub, installed fixed shower head, tub filler, temp valve and volume valve, installed tile floor, installed tile walls in tub, installed tile niche, installed extraction fan, installed toilet, installed prefab vanity cabinet, counter and sink, installed sink faucet, installed vanity mirror, installed bathroom hardware, installed vanity light, installed recessed lights
- Garage: Fixed venting and plumbing for the channel grade installed outside the garage, installed new support posts and brackets, installed Garage door opener, installed a 50 amp EV 14-50 plug for car charger